Me postulé en línea. El proceso tomó 5 semanas. Acudí a una entrevista en Lime (Montreal, QC) en feb 2024
Entrevista
HR Screening
Hiring manager
Technical assessment (coding, system design)
Virtual on-site (4x 1h)
- Leadership assessment
- System Design
- Cross-functional (product)
- Hiring manager
Got rejected after those steps.
Received a nice email asking for feedback about the interview process few days after.
Preguntas de entrevista [1]
Pregunta 1
System Design was "Design a rate limiter" and "Design Lime"