Me postulé en línea. El proceso tomó 4 semanas. Acudí a una entrevista en KONE (El Cairo, ) en abr 2015
Entrevista
Conducted in a very poor manner over the phone. the interviewer lacked the basic interview skills. it was supposed to be a technical screening interview with the SEB manager at that time however due to his personality (which I found later after joining) he just kept going on and on without giving room to the interviewee to add to the topic
Preguntas de entrevista [1]
Pregunta 1
Technical questions on how I was doing modernization in Egypt While Employed in thyssenkrupp elevator