Me postulé en línea. El proceso tomó 3 meses. Acudí a una entrevista en KBR (Leatherhead, England) en mar 2020
Entrevista
5 board members introductions, info about the company, 5 minute presentation of your choice, followed by interview - technical and non technical. All done via skpye.
All staff were friendly and new-ish HR member (I think) put effort into helping us feel at ease. I must say though that communication for organising the interview was not the clearest.
Preguntas de entrevista [1]
Pregunta 1
In a project you did, tell me about the process equipment or safety measures in the design. How did you size certain equipment...
Friendly interview. They are mostly interested if you want to learn or not. As long as you have good attitude, you have a good chance. Not many technical questions. The interview is around 90-minute long.
Me postulé en línea. El proceso tomó 5 semanas. Acudí a una entrevista en KBR (Epsom, England) en mar 2024
Entrevista
Phone Interview with HR discussing motivations, why this role, what you can contribute. The assessment centre including 2 on 1 interviews, group problem solving, presentation about something you are passionate about.
Preguntas de entrevista [1]
Pregunta 1
Describe your core strength and weakness in 1 word
Me postulé a través de una agencia de empleos. El proceso tomó 3 meses. Acudí a una entrevista en KBR (Houston, TX) en dic 2023
Entrevista
The path leading to the interview with the managers, in this case with 3 manager, extended beyond the usual duration. The interview itself was conducted in person within an exceptionally welcoming environment.
Preguntas de entrevista [1]
Pregunta 1
Guidelines on carrying out a particular sizing method that includes considerations of pips and pumps.