Me postulé en línea. Acudí a una entrevista en CarMax (Richmond, VA) en abr 2021
Entrevista
Initial call with recruiter, case interview, then panel of interviews including case studies and behavioral questions. Turnaround was quick, just a couple weeks from beginning to end, but a bit odd that they cancelled the afternoon calls after the first three panel calls. Thought they went fine but I guess they felt differently. No feedback on why they rejected me, would have been a positive experience otherwise
Preguntas de entrevista [1]
Pregunta 1
Different cost benefit type assessments. Determine which option is better, how to probabilistically determine best choice
Me postulé a través de una recomendación de un empleado. El proceso tomó 3 semanas. Acudí a una entrevista en CarMax (Richmond, VA) en mar 2022
Entrevista
Very organized interview process. started with a screening phone interview then a case study interview.
The case study interview is a phone interview which is not the best, I would prefer if it was on zoom or teams to able to share data easily
Preguntas de entrevista [1]
Pregunta 1
Math and statistics questions through a case study
Me postulé a través de otra fuente. Acudí a una entrevista en CarMax (Toronto, ON) en nov 2019
Entrevista
I was introduced to the company through a boot camp. The interview process began with the regular online application, which includes a personality test, IQ tests, and background information. Two days after, there's an online statistics test to be finished in 20 mins. The test is about reading tables and basic analysis, which is usually done in Excel. After this, there's another phone interview with an analysis question about choosing where to build a new store from two sites based on Bayesian probability.
Preguntas de entrevista [1]
Pregunta 1
Choose the location for a new store from two sites, each with different budgets and expected revenues. There's a chance of a bridge will be built to reach one of the sites, and revenue will be different. Then one can choose to build a store or resell the land to reduce the loss after knowing the bridge connects to which site.