Me postulé a través de un reclutador. El proceso tomó 2 semanas. Acudí a una entrevista en ASM Technologies (Bengaluru) en mar 2013
Entrevista
The hiring process was very straight forward. I had a call from ASM HR recruiter. She arranged for a telephonic round with the respective Engineering Lead.
I was later called for an onsite interview at ITPL tech Park in Bangalore. The face to face interview went for 45 minutes and I was interviewed by two Engineers. Once everything was done, I left and had to take another HR interview at ASM Technologies on Richmond road. I got back a call in 2 days confirming the offer.
Preguntas de entrevista [1]
Pregunta 1
I was not asked any unexpected question. Most difficult question was about some questions in basic physics which I clearly had forgotten to look up before the interview