Me postulé a través de otra fuente. El proceso tomó 3 semanas. Acudí a una entrevista en Allstate (Tempe, AZ) en feb 2019
Entrevista
Interview process was 3 interviews total, all over the phone (no video even). The first interview was with the recruiter. The second interview was a technical interview with the team. The last interview was with the manager of the team, and was not technical.