Me postulé en línea. El proceso tomó 2 semanas. Acudí a una entrevista en Altec Industries (West Lafayette, IN) en abr 2018
Entrevista
Smooth interview process. Very professional and structured. The interview was approximately 45 min long with questions. Consisted mostly of behavioral questions, not much technical questions. Applied online, and conducted interview in person.
Preguntas de entrevista [1]
Pregunta 1
Q: What was a challenging project you had to face with a team?